Fusion PPR Heater Hot Melter Fusion Machine PVC Plastic Pipes Welder Welding Machine

PPR Heater Hot Melter Fusion Machine
Unite Price 600.00Compare
Shipping Metro Manila (NCR) BinondoShips within 24 hours upon paymen
Payment Method Support COD
Sales Volume 1+
Reviews There are 0 reviews
Popularity Viewed by 25 people
Size
  • 800w
  • 900w
In Stock
+-
Available 99 Pcs
MOQ 1 Pcs
 
联系方式
加关注8

C3 Hardware Wholesale

VIP   V 1第4年
资料通过认证
保证金₱ 110000.00

his product is suitable for the connection of thermoplastic pipes such as PP-R, PE and PP-C. Our factory has the following products: ZD-1 (600W. 20, 25, 32 die), ZD-2 type (800W 20, 25, 32. 40, 50, 63 die). ZD-3 type (1200W match 75, 90, 90 die). This product has the precision of temperature control, high reliabil- ity, good safety and unique non stick plastic stripping technol- ogy, which is convenient for the user to operate.--.Main


technical indicators


1.Conditions of use: the altitude is not more than 1000 meters


Ambient humidity: -20°C-50°C


Relative humidity: 45%-95%


Voltage flipping: variable flow 110V50±1Hz


2. Temperature of the heating head: 260±5℃


3.Safety index: insulation resistance is not less than 1M2 Leakage current: less than or equal to 5mA (RMS)


usage


1.Fix the splice, install the heating end, place the splice on the rack, install the corresponding heating die according to the specification of the pipe, and tighten it inside the six corners. usually the small one at the front end and the big one at the back end.


2.Energizing


Turn on the power supply (pay attention to the power supply must have leakage protection), the red indicator light is on, the red indicator light goes off, the green light means that the splice enters the automatic temperature control state, and it can start operation. Note: in the automatic temperature control state, the red and green lights will be lighted alternately, which indicates that the splice is in a controlled state and does not affect the operation.



2. In the process of use, the hand and the flammable material can not touch the part of the electric melting heat block, so as to avoid accidents.


3. Non-professional products shall not be opened to prevent electric shock and damage the safety of the instrument.


4. If the red or green light does not jump for a long time, it shows that the instrument has failed. It should stop work immediately and cut off the power.


5. If a failure should be sent to the distribution offices or manufacturers, the users shall not be allowed to dismantle them at will.


6. Free warranty for three months from the date of purchase.


7. The temperature of the splice is adjusted. The non professional personnel should not adjust freely, so as not to affect the normal use and life of the splice.


四、Common fault and elimination method


1. Red light, not heating, show the temperature value does not rise, because of the heating plate resistance wire burning cause, should replace the heating plate.


2. Open the engine green light, not heated, temperature control over damage, change the temperature controller.


3. The red and green lights are not bright. Generally, the copper wires in the power cord are broken, or the plug contacts are not good.


4. When the user is used, please pay attention to the protection of the power line, do not move the three level plug at will. because the power line does not belong to the free warranty.


Report Favorite 0
网站首页  |  Refunds and Return Policy  |  Disclaimer  |  Help Center  |  About us  |  Contact Us  |  Use agreement  |  Privacy Policy  |  Privacy Policy  |  网站地图  |  排名推广  |  广告服务  |  积分换礼  |  网站留言  |  RSS订阅  |  违规举报